Adelaide Education Electrical Services

Findon Technical College – New Campus

A first of a kind Government technical collage set up in conjunction with major corporations to provide industry specific training to predominantly school leavers.

The two-level building is organised around a vertical learning common with a connecting tiered seating element, the design provides spaces for learning, interaction, and socialisation, all connected to industry collaboration spaces, hands on simulation areas and workshops, general learning areas, educator and support spaces. The build is to accommodate Advanced Manufacturing and Engineering, Health and Social Care and Early Childhood Education.

Our scope of work included the installation of new electrical conduits/pits, sub-mains, sub-boards, and external lighting. Internal work encompassed power, lighting, network cabling, security/fire, access control, school bell, hearing augmentation and external lighting.

Hindmarsh/Brown Falconer/Aurecon

Gleeson College – New Senior School

A new two-level senior school learning centre providing contemporary learning spaces, accompanied by the relocation of existing in ground services to suit the new build.

The scope of work included the installation of new electrical infrastructure throughout, including Main Switchboard (MSB) modification, sub-mains, and sub-boards. Internal work encompassed power, lighting, network cabling, security/access control, solar installations, and external lighting: Sarah/LUCID/Cox

A new two-level senior school learning centre providing contemporary learning spaces, accompanied by the relocation of existing in ground services to suit the new build.

The scope of work included the installation of new electrical infrastructure throughout, including Main Switchboard (MSB) modification, sub-mains, and sub-boards. Internal work encompassed power, lighting, network cabling, security/access control, solar installations, and external lighting: Sarah/LUCID/Cox

Brighton Secondary School – Major Upgrades

A new two-story middle school building providing contemporary learning spaces, accompanied by the refurbishment of existing buildings.

The scope of work included the installation of new electrical infrastructure throughout, including consumer mains, a new site Main Switchboard (MSB), sub-mains, and sub-boards. Internal work encompassed power, lighting, network cabling, security/access control, solar installations, and external lighting, including sports field lighting: Hindmarsh/Thomson Rossi Architects/Meinhardt

Blackfriars Priory School – New Aquinas Centre (STEM)

The Aquinas Centre houses STEM learning environments such as science laboratories, tech studies facilities, project rooms and isolated “think tank” areas. 
It also houses general classrooms for the school with modern and high-tech fixtures and fittings.
Our scope of work included the installation of new electrical in-ground infrastructure, sub-mains, sub-boards. Internal work encompassed power, lighting, network cabling, security/fire, access control, CCTV, PA, MATV, AV and external lighting: Partek/LUCID/Swanbury Penglase

Christies Beach High School – Major Refurbishment

Strip out and refurbishment took place in the art, science, and resource building as well as general teaching, reception, and administration. The objective was to provide much needed contemporary flexible learning spaces.